• Site survey for Earth work as well as cuts and fills volume reporting.
  • Survey layout for ~118 piles to be driven.
  • Survey layout for all pile cut offs and pile cap placement.
  • Construction layout for concrete foundations/Tank Foundations and all Steel Structures.
  • Data tracking for turnover packages.
  • Site survey for Earth work as well as cuts and fills volume reporting.
  • Survey layout for ~600 piles to be driven.
  • Survey layout for all pile cut offs and pile cap placement.
  • Data tracking for turnover.
  • Multiple project expansions
  • Survey layout for piles to be driven
  • Survey layout for all pile cut offs and pile cap placement.
  • Survey layout for concrete forms and anchor bolt placement.
  • Data tracking for turnover.

Nwr sturgeon refinery

Enbridge Lynton station

TransCanada heartland terminal

Suncor East Tank Farm

  • Survey layout for ~1900 pile to be driven.
  • Heave Tracking and measurements for geo-technical reporting.
  • Data tracking for turnover.

AB: 780-455-5121 / SK: 306-307-7117 / CORP@MARKERGEO.CA  ©2019  Marker Geomatics Inc. All rights reserved.​

Suncor Firebag

Enbridge Fort Mcmurray south

PROFESSIONAL Land Surveyors

  • Site survey for Earth work as well as cuts and fills volume reporting.
  • Survey layout for ~3950 piles to be driven.
  • Survey layout for all pile cut offs and pile cap placement.
  • Data tracking for turnover.

jacos Hangingstone Expansion

  • Site survey for Earth work as well as cuts and fills volume reporting.
  • Survey layout for ~70 piles to be driven.
  • Survey layout for all pile cut offs and pile cap placement.
  • Construction layout for concrete foundations and all Steel Structures.
  • Data tracking for turnover packages.
  • Site survey for earthwork as well as cuts and fills volume reporting.
  • Survey layout for ~66 piles to be driven.
  • Survey layout for all pile cut offs and pile cap placement.
  • Construction layout for concrete foundations/tank foundations and all steel structures.
  • Data tracking for turnover packages.
  • Survey layout for ~1100 piles to be driven.
  • Survey layout for all pile cut offs and pile cap placement.
  • Data tracking for turnover.

Encana Saturn 15-27 Expansion

Enbridge Athabasca

  • Survey layout for ~220 piles to be driven.
  • Daily pile reports completed.
  • Data Tracking for turnover.

Conoco Phillip Surmont 2

Enbridge Sunday creek

  • Site survey for Earth work as well as cuts and fills volume reporting.
  • Data tracking for turnovers.
  • High precision survey control monument establishment.
  • Site survey for earthwork in multiple work areas.
  • Site topographic surveys for grade design revisions.
  • Detailed volume reporting for the construction of 5 site ponds.
  • Construction layout for concrete foundations and more than 9000 anchor bolts.
  • Construction layout for concrete foundations/tank foundations and all steel structures.